Journey with Confidence RV GPS App RV Trip Planner RV LIFE Campground Reviews RV Maintenance Take a Speed Test Free 7 Day Trial ×
 
 


Reply
 
Thread Tools Display Modes
 
Old 11-06-2017, 01:05 AM   #1
Bronze Member
 
Join Date: Dec 2016
Location: North Carolina
Posts: 37
Default additional battery install

Finally got the extra two batteries up and attached to the chassis. They are behind my propane tank with about 10 inches of spaces between them and the tank. Ordered cables tonight so should be able to finally complete. I broke the first rivnut tool and had to get another after trying to install them without. Had to get some welding done and lots of learning along the way. Lifting the unit into place even without the batteries was fun along with drilling holes and setting the rivnuts with limited space (up on ramps). This will give me a total of 315 AH of AGM power.
Attached Images
File Type: jpg two battery picture larger.jpg (181.4 KB, 17 views)
aturner1973 is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


» Featured Campgrounds

Reviews provided by

Powered by vBadvanced CMPS v3.2.3

All times are GMT. The time now is 08:31 PM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.